1 season available
The installation of the new septic system; repairing the portion of the staircase that was burned in the fire; rough plumbing.
Installing the new siding; using stone to make the addition more cohesive with the house; visiting a trade school in Switzerland.
Checking on the rewiring of an antique chandelier; beginning stages of the backyard solar install; installing fiberglass gutters.
Painting a room; retiling the fireplace on the second floor and repairing cracks; a visit to Williamson College of the Trades to hear how some graduates are doing.